Student Work
Salisbury Pond sediment dredging feasibility study
PublicThis project examines the history of Salisbury Pond and documents that the pond is filling in with sediment. Field and laboratory tests were conducted to determine the chemical constituents present in the sediment, and once these were determined, disposal options for the sediment were determined. Dredging methods were examined, and possible methods for dredging the pond were determined. Cost estimates for these methods were developed and we recommend that the entire pond be dredged.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 01D156M
- Advisor
- Year
- 2001
- Sponsor
- Date created
- 2001-01-01
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/sj1394985