Student Work
Line of Balance Analysis of the New WPI Residence Hall
PublicDownloadable Content
open in viewerThis project proposes a scheduling approach to coordinate the final stage of activities to be conducted in the construction of a new WPI residence hall. Based on the traditional schedule generated by the Critical Path Method, the proposed approach uses the Line of Balance method to coordinate in more detail subcontractors performing repetitive operations within the building. The project also presents a structural design for a section of the building foundation to support lateral loading during construction.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-022908-095611
- Advisor
- Year
- 2008
- Sponsor
- Date created
- 2008-02-29
- Location
- Worcester
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
C08_Line_of_Balance_Final_Paper.pdf | Public | Download | ||
Line_of_Balance_Database.xls | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/9z903140v