Student Work

Developing a New Baseball Facility for WPI

Public Deposited

Downloadable Content

open in viewer

The WPI Baseball program has gone without a true home facility for nearly 10 years, commuting to Northborough daily for practices and games. The team has faced growing limits to field accessibility, forcing the team to relocate several practices and home games to different fields each year. In the search for a new facility, research, site visits, and interviews were completed to establish facility criteria. Facility options were identified and evaluated based on the criteria and preliminary cost estimates. The WPI Townhouses property was chosen, and a field design was developed adhering to all local regulations. A 3D rendering of the facility and detailed cost analysis were produced. The final design incorporates all collegiate baseball field needs with an estimated cost of $3,600,000.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • 118112
  • E-project-030124-121220
Keyword
Advisor
Year
  • 2024
UN Sustainable Development Goals
Date created
  • 2024-03-01
Resource type
Major
Source
  • E-project-030124-121220
Rights statement
Last modified
  • 2024-04-22

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/08612t23x