Student Work

Salisbury Pond sediment dredging feasibility study

Pubblico

This project examines the history of Salisbury Pond and documents that the pond is filling in with sediment. Field and laboratory tests were conducted to determine the chemical constituents present in the sediment, and once these were determined, disposal options for the sediment were determined. Dredging methods were examined, and possible methods for dredging the pond were determined. Cost estimates for these methods were developed and we recommend that the entire pond be dredged.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 01D156M
Advisor
Year
  • 2001
Sponsor
Date created
  • 2001-01-01
Resource type
Major
Rights statement

Relazioni

In Collection:

Articoli

Elementi

Permanent link to this page: https://digital.wpi.edu/show/sj1394985