Student Work
A REDESIGN OF WPI''S NEW RESIDENCE HALL USING REINFORCED CONCRETE
PublicDownloadable Content
open in viewerThis project assessed Gilbane Building Company, Cannon Design, and WPI''s decision to build with steel instead of reinforced concrete for the new on-campus residence hall. By redesigning the residence hall using reinforced concrete, developing our own management schedule, and performing a cost analysis we were able to compare the concrete design process to the steel design process that was used. We weighed the structural changes in the building, scheduling differences, and final cost to gain an understanding of the differences.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-030808-220350
- Advisor
- Year
- 2008
- Sponsor
- Date created
- 2008-03-08
- Location
- Worcester
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
Residence_Hall_Concrete_Design.pdf | Public | Download | ||
SGirder.dat | Public | Download | ||
OUT65.DAT | Public | Download | ||
Durations_Schedule.xls | Public | Download | ||
Building_Design.xls | Public | Download | ||
Schedule.xer | Public | Download | ||
Beam28.dat | Public | Download | ||
NGirder.dat | Public | Download | ||
Beam65.dat | Public | Download | ||
Cost_Estimate.xls | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/dn39x3308