Student Work
Evaluating BMP Designs for Phosphorus Removal in Cambridge
公开可下载的内容
open in viewerThis Major Qualifying Project (MQP) reviewed the Best Management Practices (BMP) Accounting and Tracking Tool (BATT) for Cambridge to reduce its phosphorus loading to the Charles River. The study, in collaboration with Stantec, involved: calculation comparisons between BATT and regulations, sensitivity analysis of inputs, model validation, and application of the model to BMP design. Using findings from the sensitivity analysis, including input of infiltrating BMPs and ideal acreage distributions, the team redesigned Cambridge stormwater projects to produce optimal phosphorus reductions.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-032218-150601
- Advisor
- Year
- 2018
- Center
- Sponsor
- Date created
- 2018-03-22
- 地点
- Boston
- Resource type
- Major
- Rights statement
关系
- 属于 Collection:
项目
单件
Permanent link to this page: https://digital.wpi.edu/show/7h149r33k