Student Work

Structural Improvement Design for Northern Strand Community Trail Bridge over Saugus River

Public

Downloadable Content

open in viewer

The project’s goal was to design an improvement solution to the 115-foot pedestrian bridge over the Saugus River along the Northern Strand Community Trail (NSCT). Three improvement alternatives were considered -- aesthetic improvements, rehabilitation, and replacement. The final improvement design consisted of a 130-foot prefabricated replacement truss structure with new concrete abutments that met AASHTO LRFD requirements. Final deliverables included primary steel member and abutment sizes, a demolition and construction plan, cost estimate, and a project schedule.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-022819-133304
Advisor
Year
  • 2019
Sponsor
Date created
  • 2019-02-28
Resource type
Major
Rights statement

Relations

In Collection:

Items

Permanent link to this page: https://digital.wpi.edu/show/6682x526j