Student Work

Corridor Study of Route CT-156 in East Lyme, Connecticut

Public Deposited

Downloadable Content

open in viewer

This MQP team collaborated with the Connecticut Department of Transportation to provide recommendations for improving Route CT-156 in East Lyme, Connecticut. Existing conditions of the corridor were documented, including curb ramp components, street layout, Complete Streets characteristics, and crash data. Improvements to the corridor included revising sidewalk accessibility to meet Americans with Disabilities Act regulations and incorporating bike paths in the street redesign. AutoCAD and Streetmix were used to finalize and present the recommendations.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-030224-085851
  • 118170
Keyword
Advisor
Year
  • 2024
Sponsor
UN Sustainable Development Goals
Date created
  • 2024-03-02
Resource type
Major
Source
  • E-project-030224-085851
Rights statement
Last modified
  • 2024-04-23

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/zs25xd822