Student Work
Corridor Study of Route CT-156 in East Lyme, Connecticut
Public DepositedDownloadable Content
open in viewerThis MQP team collaborated with the Connecticut Department of Transportation to provide recommendations for improving Route CT-156 in East Lyme, Connecticut. Existing conditions of the corridor were documented, including curb ramp components, street layout, Complete Streets characteristics, and crash data. Improvements to the corridor included revising sidewalk accessibility to meet Americans with Disabilities Act regulations and incorporating bike paths in the street redesign. AutoCAD and Streetmix were used to finalize and present the recommendations.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-030224-085851
- 118170
- Keyword
- Advisor
- Year
- 2024
- Sponsor
- UN Sustainable Development Goals
- Date created
- 2024-03-02
- Resource type
- Major
- Source
- E-project-030224-085851
- Rights statement
- Last modified
- 2024-04-23
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
Corridor_Study_of_Route_CT-156_in_East_Lyme__Connecticut.pdf | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/zs25xd822