Student Work
Twin Cities Rail Trail Pedestrian Bridge
PublicDownloadable Content
open in viewerThe purpose of this project was to evaluate an abandoned railroad bridge over Route 2 in Leominster, MA, and design structural improvements for Stantec Inc. Three redesign options were considered: repair of the existing structure, superstructure replacement, and full replacement. These options were evaluated based on aesthetics, material cost, constructability, and future impacts. The final recommendation selected was the full replacement. This design was further developed, including a demolition and traffic plan.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-121119-121424
- Advisor
- Year
- 2019
- Center
- Sponsor
- Date created
- 2019-12-11
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
Stantec_Structural_Paper_Final.pdf | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/xw42nb48x