Student Work
DESIGN OF WPI MIXED-USE FACILITY FOR GATEWAY PARK
PublicDownloadable Content
open in viewerThe project investigated preliminary design layouts as well as structural frame and construction plan for Lot 3 commercial building of the Gateway Park expansion at Worcester Polytechnic Institute. A structural design, including an additional floor featuring an open-style conference center, was established following investigations of structural steel and reinforced concrete. Elements of the foundation system were also designed. A phased construction plan, project schedule and cost estimate were prepared and submitted as project deliverables.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-121609-173456
- Advisor
- Year
- 2009
- Date created
- 2009-12-16
- Location
- Worcester
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
DESIGN_OF_WPI_MIXED-USE_FACILITY_FOR_GATEWAY_PARK.pdf | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/xd07gv32k