Student Work
The Selection of Stormwater BMPs for the Route 140/62 Discharge in Sterling, MA
PublicDownloadable Content
open in viewerThe purpose of this project was to evaluate available BMPs and ultimately design a system which reduced both sediment and nutrients in stormwater and nonpoint source pollution. Emphasis was placed on the design process which included the assessment of existing conditions, preliminary design development, detailed design, and the preparation of construction drawings and specifications. A stormwater conveyance model was developed to aid in the final design of an infiltration basin with presedimentation forebay which addressed stormwater quality issues determined from actual stormwater samples.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-060210-161711
- Advisor
- Year
- 2010
- Date created
- 2010-06-02
- Resource type
- Major
- Rights statement
- Last modified
- 2021-01-07
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/x633f241z