Student Work
Mathematical Tunnel Cost Modeling
PublicDownloadable Content
open in viewerI use empirical data and multidimensional polynomial approximation to create a model that predicts tunnel outturn cost(O) given tunnel face area (f), length (l), depth (d), density of geology (r), with a certain error. I discuss the limitations of my methods and make recommendations for improving outturn cost prediction models.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-022812-032415
- Keyword
- Advisor
- Year
- 2012
- Center
- Sponsor
- Date created
- 2012-02-29
- Location
- Melbourne
- Resource type
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
Mathematical_Cost_Modelling.pdf | Public | Download | ||
PolyfitnTools.zip | Public | Download | ||
polyscript.m | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/vx021f55f