Student Work
Investigation into Reliability of the Jubilee Line
PublicContenu téléchargeable
open in viewerMetro systems are often faced with reliability issues; specifically pertaining to safety, accessibility, train punctuality, and stopping accuracy. The project goal was to assess the reliability of the London Underground’s Jubilee Line and the systems implemented during the Jubilee Line extension. The team achieved this by interviewing train drivers and Transport for London employees, surveying passengers, validating the stopping accuracy of the trains, measuring dwell times, observing accessibility and passenger behavior on platforms with Platform Edge Doors, and overall train performance patterns.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-042717-142011
- Mot-clé
- Advisor
- Year
- 2017
- Center
- Sponsor
- Date created
- 2017-04-27
- Emplacement
- London
- Resource type
- Rights statement
Relations
- Dans Collection:
Contenu
Articles
La vignette | Titre | Visibilité | Embargo Release Date | actes |
---|---|---|---|---|
Investigation_into_Reliability_of_the_Jubilee_Line.pdf | Public | Télécharger | ||
Final_Presentation.pdf | Public | Télécharger |
Permanent link to this page: https://digital.wpi.edu/show/v979v364x