The goal of this project was to determine the viability of contingency devices connected at the secondary busses of the substation. The work was based on modeling energy flow as well as economic affects of the system. The model was developed using System Dynamics, and iThink modeling software. Through the use of the model, different option and scenarios were assessed. Results showed that energy storage technologies are currently too expensive, and generation based retrofitting options are economically viable.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 05E001M
Advisor
Year
  • 2005
Date created
  • 2005-01-01
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/st74ct50s