Student Work

Eliminating Combined Sewer Overflow in the Blackstone Canal

公开

可下载的内容

open in viewer

The Blackstone Canal District Alliance seeks to replicate or restore the Blackstone Canal. The project explored canal conditions and its role in the combined sewer system. Analysis of public works documents and interviews generated four scenarios to separate the canal from the sewer system: 1) separate the segment and add retention basin: $5 million; 2) separate the segment and add treatment shaft: $15 million; 3) separate the entire canal: $17.5 million; 4) a complete separation of CSS: $208 million.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • E-project-030515-113606
关键词
Advisor
Year
  • 2015
Center
Sponsor
Date created
  • 2015-03-05
地点
  • Worcester
Resource type
Rights statement

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/rn301166v