Student Work
Eliminating Combined Sewer Overflow in the Blackstone Canal
PublicContenu téléchargeable
open in viewerThe Blackstone Canal District Alliance seeks to replicate or restore the Blackstone Canal. The project explored canal conditions and its role in the combined sewer system. Analysis of public works documents and interviews generated four scenarios to separate the canal from the sewer system: 1) separate the segment and add retention basin: $5 million; 2) separate the segment and add treatment shaft: $15 million; 3) separate the entire canal: $17.5 million; 4) a complete separation of CSS: $208 million.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-030515-113606
- Mot-clé
- Advisor
- Year
- 2015
- Center
- Sponsor
- Date created
- 2015-03-05
- Emplacement
- Worcester
- Resource type
- Rights statement
Relations
- Dans Collection:
Contenu
Articles
La vignette | Titre | Visibilité | Embargo Release Date | actes |
---|---|---|---|---|
Blackstone_CSO_Project_Report.pdf | Public | Télécharger |
Permanent link to this page: https://digital.wpi.edu/show/rn301166v