Student Work

Mt. Washington Summit Facility Design and Wastewater Plant Analysis

Public

Downloadable Content

open in viewer

The goal of this project was to design an environmental research facility with an adequate fire protection system and to improve the wastewater treatment on the summit. This project assessed building and wastewater treatment needs for the extreme weather conditions on the summit of Mount Washington in New Hampshire. Two separate structural frames using structural steel and concrete were designed, and the structural steel frame was recommended as the best option. An INERGEN fire protection system was selected for the proposed research facility. The current package wastewater treatment plant's influent and effluent characteristics were analyzed. Recommendations were made to modify the processes of the current wastewater treatment plant and to improve influent characteristics.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-030311-134701
Advisor
Year
  • 2011
Date created
  • 2011-03-03
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/rf55z931j