Student Work
The Selection of a best management practice for the control of sedimentation in Salisbury Pond
PublicThe project ... focused on reducing sediment loads entering Salisbury Pond at its main inlet. A sedimentation basin was designed based on original and archival data, a hydrologic model and research of appropriate BMPs. The design criteria included available area, peak flow capacity, removal efficiency, maintenance, and environmental and aesthetic concerns. The implementation of a BMP was vital to the future existence of Salisbury Pond.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 04D156M
- Advisor
- Year
- 2004
- Date created
- 2004-01-01
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/r781wk45j