Student Work

Equipment replacement decisions in power distribution systems

Public

This project relates to National Grid's infrastructure of low-voltage distribution assets. The goal of this project is to provide a basis for consistent decision making in the area of Electric Power Distribution Systems. The first part of the project deals with cable (Underground Residential Developments) replacement under the constraints of limited budget and uncertain risk. In the second part of the project, we used our findings about the URD replacement methods to conduct replacement techniques in a wider range of power distribution equipment.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 03B026M
Advisor
Year
  • 2003
Date created
  • 2003-01-01
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/pk02cd596