Student Work

Worcester Vocational High School - Part III

Public

This project analyzes the construction project management of the Worcester Vocational High School between July 2004 and February 2005. Project managers provided information that the MQP team analyzed to discuss the contractual structure of the project plus how information was gathered and utilized by them. Using Primavera, a schedule of the gymnasium was created to track its progress allowing for the identification of delays. A structural analysis was performed on the gym floor to determine the effects of increased loads.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 05D081M
Advisor
Year
  • 2005
Sponsor
Date created
  • 2005-01-01
Resource type
Major
Rights statement

Relations

Dans Collection:

Contenu

Articles

Permanent link to this page: https://digital.wpi.edu/show/p5547v58w