Student Work
Structural Bridge Design and Construction Traffic Management Plan for the Route 24/140 Interchange
公开The purpose of this project was to provide a structural design recommendation for a bridge replacement in Taunton, MA. The team evaluated the current conditions, and presented a bridge layout that met MassDOT, FHWA, and AASHTO requirements. Additionally, the group provided a cost estimate, traffic management plan and construction staging schedule as a supplement to the design. In the end, the team determined that a one-span steel bridge using slide-in bridge construction methods was cost-effective and best satisfied project requirements.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- 贡献者
- Publisher
- Identifier
- E-project-030217-125415
- Advisor
- Year
- 2017
- Center
- Sponsor
- Date created
- 2017-03-02
- 地点
- Taunton
- Resource type
- Major
- Rights statement
关系
- 属于 Collection:
项目
单件
缩略图 | 标题 | 公开度 | Embargo Release Date | 行动 |
---|---|---|---|---|
|
Stantec_Taunton_Interchange_Final.pdf | 公开 | 下载 | |
|
Stantec_Final_Presentation1.pptx | 公开 | 下载 |
Permanent link to this page: https://digital.wpi.edu/show/m326m301v