HPT Blades Rework Improvement Design and Implementation

公开

可下载的内容

open in viewer

This project focused on improving the rework cycle at Glades Park, General Electric Services Cincinnati Shop in Hamilton, Ohio. Analyses of rework cycles through routers, the master menu system and shop floor operators prompted investigation of three main problem areas: turn-around-time (TAT), margin degradation and balancing yield. This lead to improvements in two areas; TAT was reduced by removing unnecessary steps within rework processes and margin degradation was addressed by developing guidelines that advise management when to investigate straggling blades.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-102207-141021
Advisor
Year
  • 2007
Sponsor
Date created
  • 2007-10-22
地点
  • Cincinnati
Resource type
Major
Rights statement

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/m039k6388