Modeling Collaboration in Civil Engineering

公开

可下载的内容

open in viewer

Collaboration in a complex civil engineering project is modeled by two linear programs using leaks and node collapse. These linear programs are based on an event-oriented network and a task-oriented network. The critical path method is used to identify possible areas for collaboration. Node collapse is used to model collaboration in the task-oriented network. Leaks between nodes are used in the event-oriented network to model collaboration and assign a value to the collaboration.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-053007-111004
Advisor
Year
  • 2007
Date created
  • 2007-05-30
Resource type
Major
Rights statement
最新修改
  • 2020-11-24

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/kh04dr390