Student Work
Inventory management for lean manufacturing at General Electric
PublicThis Major Qualifying Project involves developing an information system that generates reports used to improve inventory management at General Electric Aircraft Engines (GEAE) in Lynn, Mass. The development life cycle of this project involves determining GEAE's current methods of obtaining inventory information and analyzing technology's role in improving those methods. This information system uses database technology to provide GEAE with a knowledge management tool, which contributes to substantial improvements of efficiency in GEAE's manufacturing operation.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 01B036M
- Advisor
- Year
- 2001
- Sponsor
- Date created
- 2001-01-01
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/k0698b43p