CIRCOR Lean Manufacturing System
PúblicoConteúdo disponível para baixar
open in viewerThe principal objective of this project is to evaluate the need for and implementation of lean manufacturing systems at Spence Engineering Company. The proposed methods for evaluation and validation include a reconfiguration of the current state plant layout, creating a new value-added re-distribution of parts, integrative CAD model of the proposed layout and optimization of machines tools. We will show how the new layout can eliminate waste and delays. The outcome will also provide a detailed explanation of the steps taken to implement the changes in the Company. The essentials of lean manufacturing systems and technology are fully integrated into the new model system. The risk of machining down time, long setup times and unintentional accidents are minimized in the new layout.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-042413-190756
- Advisor
- Year
- 2013
- Sponsor
- Date created
- 2013-04-24
- Localização
- Walden
- Resource type
- Major
- Rights statement
Relações
- Em Collection:
Itens
Itens
Miniatura | Título | Acesso | Embargo Release Date | Ações |
---|---|---|---|---|
WPI-MQP_Adam_Alberto_Sayok_FINAL.pdf | Público | Baixar |
Permanent link to this page: https://digital.wpi.edu/show/jd472z31w