Student Work
Design of a Tie-Back Anchor for MIW Corporation
ÖffentlichHerunterladbarer Inhalt
open in viewerDesign analysis of multiple options for a through-bolt tieback anchor was proposed. The main objective of the project was to design an anchor with high constructability while also cost effective for production and sale by MIW Corporation. This objective was met through engineering drawings and structural analyses of multiple designs, and a multi-attribute analysis identified the most effective option. The project also included a detailed final design that met standards imposed by the Occupational Safety and Health Administration.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-072415-152703
- Advisor
- Year
- 2015
- Sponsor
- Date created
- 2015-07-24
- Resource type
- Major
- Rights statement
Beziehungen
- In Collection:
Objekte
Artikel
Miniaturansicht | Titel | Sichtbarkeit | Embargo Release Date | Aktionen |
---|---|---|---|---|
DESIGN_OF_A_TIE-BACK_ANCHOR.pdf | Öffentlich | Herunterladen |
Permanent link to this page: https://digital.wpi.edu/show/j3860842k