Student Work

Corridor Study of Route CT-156 in East Lyme, Connecticut

Öffentlich Deposited

Herunterladbarer Inhalt

open in viewer

This MQP team collaborated with the Connecticut Department of Transportation to provide recommendations for improving Route CT-156 in East Lyme, Connecticut. Existing conditions of the corridor were documented, including curb ramp components, street layout, Complete Streets characteristics, and crash data. Improvements to the corridor included revising sidewalk accessibility to meet Americans with Disabilities Act regulations and incorporating bike paths in the street redesign. AutoCAD and Streetmix were used to finalize and present the recommendations.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Subject
Publisher
Identifier
  • 121721
  • E-project-042524-132401
Stichwort
Advisor
Year
  • 2024
Sponsor
UN Sustainable Development Goals
Date created
  • 2024-04-25
Resource type
Major
Source
  • E-project-042524-132401
Rights statement

Beziehungen

In Collection:

Objekte

Artikel

Permanent link to this page: https://digital.wpi.edu/show/dn39x5794