Student Work
Nutrient Removal at the Gardner Wastewater Treatment Facility
公开可下载的内容
open in viewerThe purpose of this project was to aid the City of Gardner in anticipation of their National Pollution Discharge Elimination System (NPDES) renewal process by providing a comprehensive water quality analysis of the facility and its receiving water body, the Otter River. Water quality parameters were evaluated in order to determine requirements for advanced treatment options. Design alternatives for a biological nutrient removal process were explored, and a Modified Ludzack-Ettinger retrofit was recommended as the most practical solution.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-030414-220055
- Advisor
- Year
- 2014
- Sponsor
- Date created
- 2014-03-04
- Resource type
- Major
- Rights statement
关系
- 属于 Collection:
项目
Permanent link to this page: https://digital.wpi.edu/show/dn39x301t