Student Work

Nutrient Removal at the Gardner Wastewater Treatment Facility

公开

可下载的内容

open in viewer

The purpose of this project was to aid the City of Gardner in anticipation of their National Pollution Discharge Elimination System (NPDES) renewal process by providing a comprehensive water quality analysis of the facility and its receiving water body, the Otter River. Water quality parameters were evaluated in order to determine requirements for advanced treatment options. Design alternatives for a biological nutrient removal process were explored, and a Modified Ludzack-Ettinger retrofit was recommended as the most practical solution.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-030414-220055
Advisor
Year
  • 2014
Sponsor
Date created
  • 2014-03-04
Resource type
Major
Rights statement

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/dn39x301t