Student Work

WPI Pedestrian Bridge and Athletic Building: Structural Design

Öffentlich

Herunterladbarer Inhalt

open in viewer

Currently, WPI does not fully utilize its property at the location of the A.J. Knight Field and tennis courts due to safety and accessibility concerns from the crossing of MA Route 122A. An indoor athletic and training facility was designed to fully utilize this property and expand the current athletic facilities. An enclosed pedestrian bridge was designed to increase foot traffic and accessibility to this area of campus by connecting it to the current Sports and Recreation Center. The scope of this project included architectural planning, site design, structural design, and cost analysis, and computer modelling for both structures.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-032018-122102
Advisor
Year
  • 2018
Date created
  • 2018-03-20
Ort
  • Worcester
Resource type
Major
Rights statement

Beziehungen

In Collection:

Objekte

Artikel

Permanent link to this page: https://digital.wpi.edu/show/db78td41s