Student Work
Safe yield analysis and watershed enhancement of the Ten Mile River Basin for the City of Attleboro, Massachusetts
ÖffentlichThis project recalculated the safe yield of the Ten Mile River Basin in the City of Attleboro, MA, and evaluated ways to enhance this yield. The Bungay River was selected to transfer water to the main reservoir within the city's supply system and evaluated as a source. A computer model was developed to estimate the safe yield and examine the effects of transferring this flow. Preliminary designs for a pump station and cost estimates were developed for this transfer.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 00D065M
- Advisor
- Year
- 2000
- Sponsor
- Date created
- 2000-01-01
- Resource type
- Major
- Rights statement
Beziehungen
- In Collection:
Objekte
Permanent link to this page: https://digital.wpi.edu/show/cv43p1092