Student Work

GATEWAY PARK PROJECT: CEMENTITIOUS UNDERLAYMENT & INFORMATION EXCHANGE

Público

Contenido Descargable

open in viewer

Two aspects of the construction of the Gateway Park Project were studied: the cracking of the cementitious underlayment of the floors at 68 Prescott Street and information exchange between owners and construction managers. An investigation into the behavior of timber/concrete floors was conducted by testing a composite and noncomposite system, as well as performing a cost analysis. Information exchange was evaluated through use of surveys and meeting checklists.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-031207-145450
Advisor
Year
  • 2007
Sponsor
Date created
  • 2007-03-12
Resource type
Major
Rights statement

Las relaciones

En Collection:

Elementos

Elementos

Permanent link to this page: https://digital.wpi.edu/show/cc08hh415