Student Work
Bose IR Reception Test Improvements
PubblicoContenuto scaricabile
open in viewerThis Major Qualifying Project was completed in conjunction with Bose Corporation to develop a robust, qualitative, and repeatable test procedure to qualify the Infrared Systems for products within BoseÂ’s Consumer Electronics Division. The test procedure will reduce the current measurement error by 50% and decrease the test time to 1/4 the time of the current procedure. Through data analysis, fixture development, and process qualifying, a final procedure was developed and recommendations were developed. Based on design criteria, this project proposes a method to set up, record, and evaluate BoseÂ’s Infrared System for any past, current, and future product.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-032416-133057
- Advisor
- Year
- 2016
- Sponsor
- Date created
- 2016-03-24
- luogo
- Framingham
- Resource type
- Major
- Rights statement
- Ultima modifica
- 2021-02-01
Relazioni
- In Collection:
Articoli
Elementi
Thumbnail | Titolo | Visibilità | Embargo Release Date | Azioni |
---|---|---|---|---|
Bose_MQP_Final_Report.pdf | Pubblico | Scaricare |
Permanent link to this page: https://digital.wpi.edu/show/bz60cz12c