Analysis of More Efficient Methods for Operation Playhouse
PublicDownloadable Content
open in viewerThe purpose of a playhouse is to provide a comfortable place for the veterans family to bond and play. The intention of our project was to develop a procedure for reducing waste, cost and production time to build a single playhouse. To achieve this, we determined high quality materials that are less expensive than those currently used, reduced material waste from each build, and identified a standardized construction method to reduce building time and cost. Completion of this project resulted in a blueprint with optional, alternative materials and dimensions, step-by-step assembly instructions, including videos, for HFHMW/GW and the volunteers to use, and a formal report outlining the results of the methodology.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-030118-133504
- Keyword
- Advisor
- Year
- 2018
- Center
- Sponsor
- Date created
- 2018-03-01
- Location
- Worcester
- Resource type
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
Habitat_Final_Submission.pdf | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/br86b3901