Student Work
An examination of the fast-tracked project delivery system in the United States
PublicThis report presents a study of the fast-tracked project delivery system based on a Guaranteed Maximum Price. This delivery system is characterized by the involvement of a general contractor during the design phase of a project. The study reflects the analysis of the contractor's activities during and after this phase. The analysis was based on the review of pertinent literature, standard contracts, actual project documents, and interviews with the personnel of Turner Construction.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 01D294M
- Advisor
- Year
- 2001
- Sponsor
- Date created
- 2001-01-01
- Resource type
- Rights statement
Relations
- Dans Collection:
Contenu
Permanent link to this page: https://digital.wpi.edu/show/9s161906h