Reducing Dwell Time: London Underground Central Line
PublicDownloadable Content
open in viewerInconsistent and excessive dwell times often cause delays to underground metro systems. The goal of this project was to recommend solutions to minimize dwell times in the Central Line of the London Underground. The team conducted employee interviews, station observation, train observation, CCTV observation, and passenger surveys to more thoroughly understand the issue. Our team identified four system constraints that could be altered to encourage more efficient passenger behavior in order to reduce dwell times.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-062316-085013
- Keyword
- Advisor
- Year
- 2016
- Center
- Sponsor
- Date created
- 2016-06-23
- Location
- London
- Resource type
- Rights statement
- Last modified
- 2021-01-06
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
TfLIQPFinalReport.pdf | Public | Download | ||
TfL_IQP_Final_Presentation.pdf | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/9s161673r