Student Work

 

Goddard Hall Air Audit Public

Downloadable Content

open in viewer

The goal of this project was to assess the current conditions of the heating, ventilation and air conditioning system in Goddard Hall and determine ways that it could be improved. Due to current conditions, Goddard Hall is overly negatively pressurized, resulting in uncomfortable classrooms and hallways as well as making the front door extremely difficult to open. After analysis of the mechanical drawings, as well as walkthroughs to observe current conditions and record temperature data and system deficiencies, the research team was able to determine multiple possible solutions of various scope and cost impact, to improve the overall building comfort.

Creator
Publisher
Identifier
  • E-project-051220-180510
Advisor
Year
  • 2020
Date created
  • 2020-05-12
Resource type
Major
Rights statement
License

Relationships

In Collection:

Items

Permanent link to this page: https://digital.wpi.edu/show/9593tx62q