Student Work

Storm damage planning

Public

This project was a collaboration with National Grid to create a means of modeling the estimated time of restoration after a major weather event interrupts power. By using data collected during the course of the project, two models were created that statistically derive the estimated time of restoration. The Pre-Damage Assessment ETR Calculator forecasts the ETR using historical storm data. The Damage Assessment ETR Calculator determines the ETR based on the amount of work that needs to be done.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 07D040M
Advisor
Year
  • 2007
Sponsor
Date created
  • 2007-01-01
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/9306t249b