Student Work
Storm damage planning
PublicThis project was a collaboration with National Grid to create a means of modeling the estimated time of restoration after a major weather event interrupts power. By using data collected during the course of the project, two models were created that statistically derive the estimated time of restoration. The Pre-Damage Assessment ETR Calculator forecasts the ETR using historical storm data. The Damage Assessment ETR Calculator determines the ETR based on the amount of work that needs to be done.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 07D040M
- Advisor
- Year
- 2007
- Sponsor
- Date created
- 2007-01-01
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/9306t249b