Student Work

D&S

Public

This project conducted research and applied lean manufacturing practices to reduce setup time in VMC machine operations at D&S Manufacturing to standardized setup procedures for the VMC machines and to facilitate the organization and safety of the shop floor. Simultaneously the project applied Kaizen methods to create a standardized form of measurement to improve their VMC machine utilization. Finally this project created a checklist to assist in the preventative maintenance of the VMC machines and their equipment.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 06C048M
Advisor
Year
  • 2006
Sponsor
Date created
  • 2006-01-01
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/7w62fc195