The project goal was to reassemble and create a test rig for an existing hydraulic load-sharing unit, consisting of three individual ball nuts connected by hydraulic cylinders. The test rig was designed to use weights dropped as a repeatable force application to determine the load sharing unit’s efficiency and load sharing capabilities to warrant further testing and development. This was done in a limited time frame of 16 weeks and with a limited budget. Due to this and electronic issues, the project was not finished and needs to be continued in the future.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-020220-103725
Advisor
Year
  • 2020
Sponsor
Date created
  • 2020-02-02
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/7s75df930