Optimizing a Production System for the Refurbishment of Disk Drives
ÖffentlichHerunterladbarer Inhalt
open in viewerThe goal of this MQP was to assist CNE Direct in their aim of increasing their monthly throughput. We conducted background research on the company’s current system, studied multiple process optimization options, and recommended ones we believed fit the company’s needs. The methods used were an axiomatic design decomposition, value stream mapping, schedule optimization, and process modeling. Our results included the detection of couplings in the production process, incompatibility of one-piece flow with the existing batch scheduling system, and finally, validation of CNE Direct’s current process model. Our ultimate conclusion is that the most effective way for CNE Direct to increase throughput is to add capacity to their existing system.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Mitwirkende
- Publisher
- Identifier
- E-project-090914-171158
- Advisor
- Year
- 2014
- Sponsor
- Date created
- 2014-09-09
- Ort
- Peabody
- Resource type
- Major
- Rights statement
- Zuletzt geändert
- 2021-09-11
Beziehungen
- In Collection:
Objekte
Artikel
Miniaturansicht | Titel | Sichtbarkeit | Embargo Release Date | Aktionen |
---|---|---|---|---|
Report.pdf | Öffentlich | Herunterladen |
Permanent link to this page: https://digital.wpi.edu/show/7h149r24m