Student Work

New WPI Parking Lot-Athletic Field: Deep and Shallow Foundation Design and Construction Planning

公开

可下载的内容

open in viewer

This project proposes a combined shallow and deep foundation design for the construction of a new integraded parking garage and athletic field structure for Worcester Polytechnic Institute (WPI). It mainly focuses on the foundations design of the building and on the construction planning and Project Management, using of the traditional schedule with the Critical Path Method. The project also develops a Building Information Modeling (BIM) digital 3D model and extends it to a 5D model for integration of time and cost.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-043012-113203
Advisor
Year
  • 2012
Date created
  • 2012-04-30
地点
  • Worcester
Resource type
Major
Rights statement

关系

属于 Collection:

项目

单件

Permanent link to this page: https://digital.wpi.edu/show/7d278v57x