Student Work

 

New WPI Parking Lot-Athletic Field: Deep and Shallow Foundation Design and Construction Planning Public

Downloadable Content

open in viewer

This project proposes a combined shallow and deep foundation design for the construction of a new integraded parking garage and athletic field structure for Worcester Polytechnic Institute (WPI). It mainly focuses on the foundations design of the building and on the construction planning and Project Management, using of the traditional schedule with the Critical Path Method. The project also develops a Building Information Modeling (BIM) digital 3D model and extends it to a 5D model for integration of time and cost.

Creator
Publisher
Identifier
  • E-project-043012-113203
Advisor
Year
  • 2012
Date created
  • 2012-04-30
Location
  • Worcester
Resource type
Major
Rights statement
License

Relationships

In Collection:

Items

Permanent link to this page: https://digital.wpi.edu/show/7d278v57x