Student Work
New WPI Parking Lot-Athletic Field: Deep and Shallow Foundation Design and Construction Planning
PublicDownloadable Content
open in viewerThis project proposes a combined shallow and deep foundation design for the construction of a new integraded parking garage and athletic field structure for Worcester Polytechnic Institute (WPI). It mainly focuses on the foundations design of the building and on the construction planning and Project Management, using of the traditional schedule with the Critical Path Method. The project also develops a Building Information Modeling (BIM) digital 3D model and extends it to a 5D model for integration of time and cost.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-043012-113203
- Advisor
- Year
- 2012
- Date created
- 2012-04-30
- Location
- Worcester
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
MQPFINAL.pdf | Public | Download | ||
TERRENO_6-8.rvt | Public | Download | ||
Footing_Type_1.xls | Public | Download | ||
Qult_for_footing_type1.xls | Public | Download | ||
Drilshaft1.xlsx | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/7d278v57x