Student Work
The Environmental effects of sewer conversion in the Gates Brook watershed
公开The intent of this project was to develop a design process that would analyze the effects of a sewer system conversion in the Gates Brook subwatershed. The sewer system that is presently under construction in the Gates Brook area will essentially remove part of the groundwater recharge formerly supplied by septic system effluent. The design process within this project was developed with the intention of providing a reference for future, similar watershed projects.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 99D182M
- Advisor
- Year
- 1999
- Date created
- 1999-01-01
- Resource type
- Major
- Rights statement
关系
- 属于 Collection:
Permanent link to this page: https://digital.wpi.edu/show/73666750k