Student Work

Roof Robot Phase 2

Public

Downloadable Content

open in viewer

In 2006 and 2007, a team of students completed a rooftop robotic platform for a sponsor. While that project performed admirably, there were numerous electrical, mechanical, and control issues with the robot. In order to address these issues, the team performed numerous enhancements on the previous year's design in order to grant the robot superior traction as well as a more centralized and detailed user interface. Work on the platform is expected to continue in future MQPs.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-042408-100309
Advisor
Year
  • 2008
Sponsor
Date created
  • 2008-04-24
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/5t34sm14q