Student Work
Stormwater Management Plan for the West Boylston Brook Subbasin
PúblicoContenido Descargable
open in viewerThis goal of this project was to create a stormwater management plan for the West Boylston subbasin in the Wachusett Reservoir watershed. Existing conditions were determined using field observations, GIS mapping, laboratory testing, and pollutant loading calculations. Computer modeling predicted the effectiveness of potential improvements and solutions were prioritized through a weighting system. The management plan included conceptual designs for retrofitting structural and non-structural best management practices, including bioretention and a pet waste program, to improve the subbasin's stormwater infrastructure.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- E-project-121611-123031
- Advisor
- Year
- 2011
- Date created
- 2011-12-16
- Ubicación
- West Boylston
- Resource type
- Major
- Rights statement
Las relaciones
- En Collection:
Elementos
Elementos
Miniatura | Título | Visibilidad | Embargo Release Date | Acciones |
---|---|---|---|---|
MQP_Report_1.0.pdf | Público | Descargar |
Permanent link to this page: https://digital.wpi.edu/show/5d86p163k