This goal of this project was to create a stormwater management plan for the West Boylston subbasin in the Wachusett Reservoir watershed. Existing conditions were determined using field observations, GIS mapping, laboratory testing, and pollutant loading calculations. Computer modeling predicted the effectiveness of potential improvements and solutions were prioritized through a weighting system. The management plan included conceptual designs for retrofitting structural and non-structural best management practices, including bioretention and a pet waste program, to improve the subbasin's stormwater infrastructure.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-121611-123031
Advisor
Year
  • 2011
Date created
  • 2011-12-16
Ubicación
  • West Boylston
Resource type
Major
Rights statement

Las relaciones

En Collection:

Elementos

Elementos

Permanent link to this page: https://digital.wpi.edu/show/5d86p163k