WPI New Athletics Facility - An Integrated Approach to Pre-Construction Practices
公开可下载的内容
open in viewerThis project encompassed various limited pre-construction tasks, including conceptual design through BIM Modeling, structural design, construction feasibility, cost estimation, and investment analysis concerning Worcester Polytechnic Institute's new athletics facility within the context of integrated practice. Currently Integrated Practice is still young in development and has had limited exposure to the construction industry. The project determined that integrated practices can reduce errors, address issues earlier in design phases, and reduce construction times if specific project objectives, scheduling, and modes of communication are clearly defined. With proper implementation and organization, Integrated Practice can possibly become the standard method of construction in the future.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- 贡献者
- Publisher
- Identifier
- E-project-031009-110603
- Advisor
- Year
- 2009
- Sponsor
- Date created
- 2009-03-10
- 地点
- Worcester
- Resource type
- Major
- Rights statement
- 最新修改
- 2023-11-07
关系
- 属于 Collection:
项目
Permanent link to this page: https://digital.wpi.edu/show/4b29b739n