Student Work
General Electric Cincinnati service shops consolidation feasibility study
PublicThis project explored the feasibility of lowering overhead costs for General Electric's Cincinnati Service Shops by eliminating the dock facility, Container Place 2. A modified Systematic Layout Planning technique was used to investigate the aircraft engine repair shops and their existing operations. Two consolidation plans for Container Place 2 were developed, including new facility layouts, cost-benefit analyses contrasting the plans against maintaining the present facilities, and action plans for necessary business process adaptations.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Publisher
- Identifier
- 05B004M
- Advisor
- Year
- 2005
- Sponsor
- Date created
- 2005-01-01
- Resource type
- Major
- Rights statement
Relations
- In Collection:
Items
Permanent link to this page: https://digital.wpi.edu/show/3t945t91h