Advising the CTDOT on Accessibility Compliance, Safety, and Stormwater Management in Bridgeport, CT
Public DepositedDownloadable Content
open in viewerThe purpose of this Major Qualifying Project was to redesign an intersection to assist the CTDOT with their goal of improving ADA accessibility while addressing flooding risks and safety for all users. A five-way signalized intersection was selected that has traffic concerns in addition to having non-compliant curb ramps and crossings. The team conducted a site visit to inspect curb ramps and collect data on the existing conditions. The short-term solutions address the non-compliant ramps, pedestrian safety, and traffic flow. The long-term design of the intersection involves the creation of a roundabout in AutoCAD, the relocation of pedestrian crossings, and the inclusion of new stormwater BMPs based on a Civil 3D water drop analysis.
- This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
- Creator
- Subject
- Publisher
- Identifier
- E-project-030224-140131
- 118177
- Keyword
- Advisor
- Year
- 2024
- Sponsor
- UN Sustainable Development Goals
- Date created
- 2024-03-02
- Resource type
- Major
- Source
- E-project-030224-140131
- Rights statement
- Last modified
- 2024-04-22
Relations
- In Collection:
Items
Items
Thumbnail | Title | Visibility | Embargo Release Date | Actions |
---|---|---|---|---|
Final_Report-combined-compressed.pdf | Public | Download |
Permanent link to this page: https://digital.wpi.edu/show/3f462988k