Dam Construction Alternatives

Público

Conteúdo disponível para baixar

open in viewer

This project describes and assesses three different dam construction techniques: concrete-filled cellular sheet pile cell; float-in; and roller compacted concrete. A model was designed to help a client, entry-level engineer, and engineering firm understand the factors associated with specific site locations that help choose the appropriate dam construction technique. Stantec Consulting Service Inc. will use this model in the future during the preliminary assessment process for dam rehabilitation projects along the Kentucky River.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • E-project-030311-143703
Advisor
Year
  • 2011
Sponsor
Date created
  • 2011-03-03
Localização
  • Lexington
Resource type
Major
Rights statement

Relações

Em Collection:

Itens

Itens

Permanent link to this page: https://digital.wpi.edu/show/2801pj13k