Student Work

Power system integrity

Public

The purpose of Power System Integrity project is to provide a means of automatically notifying Power Companies of the location of downed or sagging distribution lines. The system will consist of two components: devices that will monitor lines to detect problems, and a controller that will inform the company when and where a problem is detected. This project focused on the design of the device that will monitor the distribution lines, while specifications for the controller were contrived.

  • This report represents the work of one or more WPI undergraduate students submitted to the faculty as evidence of completion of a degree requirement. WPI routinely publishes these reports on its website without editorial or peer review.
Creator
Publisher
Identifier
  • 00D279M
Advisor
Year
  • 2000
Date created
  • 2000-01-01
Resource type
Major
Rights statement

Relations

In Collection:

Items

Items

Permanent link to this page: https://digital.wpi.edu/show/1c18dj809